The combined suspended lifting system requires that the roof structure of the customer's factory building can withstand sufficient strength and safely support the crane load.
Customers can install multiple main beams on a set of fixed rails, significantly enhancing production efficiency.
It adopts anodic electroplating process and does not require painting.
The starting force is 200:1, and the running driving force is 300:1
Aluminum alloy material, unique track cross-section design, ergonomics, precise positioning
It has a small push-pull force, is easy to control, and is convenient for precise positioning with high operational flexibility
The selection of the track is jointly determined by the load and the suspension distance
The combination of reinforced beams and tracks can achieve a greater span and load-bearing capacity
Easy to install









